Troubleshooting guide

APPENDIX F
TOP VIEW
SIDE VIEW
INSTALLATION CLEARANCES
1) THIS APPLIANCE MAY BE INSTALLED ON COMBUSTIBLE FLOORING
2) MINIMUM CLEARANCES TO ADJACENT CONSTRUCTION ARE AS FOLLOWS:
LEFT AND RIGHT SIDES: 24''
FRONT: 24"
REAR: 43" (SEE NOTE)
CEILING HEIGHT: 101"
BENCHMARK 3 MIL. BTU LOW NOx
GAS FIRED BOILER
INSTALLATION CLEARANCES
28"
COMPONENT SELECTION, ARRANGEMENT, AND LOCAL CODE REQUIREMENTS. HOWEVER,
REAR CLEARANCE MAY BE REDUCED TO 24" DEPENDENT UPON PIPING AND VENTING
NOTE:
NORTHVALE, NJ 07647
INTERNATIONAL, INC.
APPD.
DWN.BY
SCALE
DATE
MC
DATE
GS
061506
AERCO
SD-A-686 B
REV.
REAR
FRONT
24"
43"
24"
24"
101"
4" HIGH PAD
79"
78"
18"
WHEN USING A REAR CLEARANCE OF LESS THAN 43", A 57" FRONT CLEARANCE
WILL BE NEEDED TO ALLOW THE REMOVAL OF EXHAUST CONNECTING MANIFOLD.
(SEE NOTE)
F-4
APPENDIX F
F-4