Installation Guide

Wellington Wrap
Wellington Wrap
Wellington Wrap
-
-
-
Around Aluminum Column
Around Aluminum Column
Around Aluminum Column
INSTALLATION INSTRUCTIONS
W
ELLINGTON
W
RAP
-A
ROUND
A
LUMINUM
C
OLUMN
1. Measure the height of the opening where the column will be placed. Cut each col-
umn stave (piece)
1/4” longer than the opening. A circular saw with a metal cutting
blade is recommended for cutting the staves.
2.
T
o assemble the column, snap the interlocks of two staves together beginning at
one end and continuing along the length of the column. Continue to add staves in
this manner. Snap the final stave into place and tap lightly with a rubber mallet if nec-
essary to ensure the joint is fully engaged. For wrap-around-post installation follow
above instructions but add final stave with the partially assembled column in an up-
right position around the interior post.
3.
T
o secure the column, attach the column to the overhead beam or header with th
e
a
ppropriate fasteners and screws. Repeat this at the bottom of the column.
Note: High performance tie down brackets are available at an additional charge.
4
.
T
o assemble and install the capital and base, drill and counter-sink through flat sur-
face of both halves of the base with
1/8” bit. Install both halves to the bottom of the
column, flush with the floor, and secure them with the provided screws on all sides.
Repeat this process with the capital at the top of the column. If needed, caulk between
seams for a finished look.
To assemble and install the astragal, drill and counter-sink through flat surface of both
halves of astragal with 1/8” bit. Position at height desired (usually about 12” – 18” be-
low capital). Then attach both halves to the column, and secure them with the provid-
ed screws on all sides. If needed, caulk between seams for a finished look.
Notes:
a. For best load-bearing performance, utilize AFCO load-bearing plates to spread the load over the entire perimeter of
the column. Load-bearing capacity is dependent on distributing the load evenly over the surfaces of the shaf
t.
b
. All column staves should be cut square and to the same length.
c. Installation should be on a smooth level surface.
d. 2nd story balconies should not be attached directly to the side of any column.
e. Columns should be installed according to standard construction practices and in compliance with applicable local,
state, and federal regulations.