Installation Instructions

Prerequisites and Site Planning
Chapter
2
Oct 2013
AfiAct II™ Installation Manual22
2.4.3 Network Connections
AfiFarm5 Network connections must comply with the following conditions:
x The network is supported by Windows.
x The network supports TCP/IP.
x The network must be transparent for a UDP broadcast.
x The LAN must have a minimum speed of 100 MBps.
NOTE
In order to print reports, the system must have a printer, connected either
directly to the PC or via the network.