Service manual

Section IV: On-line Processor
Installation 1-27
12. Inspect each of the three roller rack assemblies. Check that the gears mesh
properly and operate smoothly when turned manually.
CAUTION: Installing the racks (in the next step) requires two people
unless the crane is installed. If two people are not available at this
step in the installation, see
The Avantra 36/44 Crane Service Manual
,
Chapter 1, Installing the Crane.
13. Put the racks in in the following order:
a. developer
b. fixer
c. wash
Refer to Figure 1-22.
Figure 1-22 Racks.
–Developer. –Fixer. –Wash.
1
2 3