User`s guide
2-2 User’s and Service Guide
Getting Started
Connecting and Turning on the Test Set
Connecting and Turning on the Test Set
The test set is designed to be placed underneath the network analyzer 
in a rack system and connected to it as shown in Figure 2-1. Use the 
two SMA 50 Ω jumper cables, part number 08720-20245, that were 
shipped with the test set. See Table 1-1 on page 1-3.
Figure 2-1  Connecting the Test Set to the Network Analyzer
After all the proper connections have been made, turn on the test set 
using the front panel line switch. The front panel line switch 
disconnects the mains circuits from the mains supply after the EMC 
filters and before other parts of the instrument.
NOTE For accurate, repeatable measurements, be sure to let the test set warm 
up for at least 2 hours. It is recommended that the test set not be 
turned off on a regular basis. For the most stable and accurate 
measurements, leave the test set turned on at all times.










