Specifications
3-7
Testing Performance
To verify digital channel threshold accuracy
1
Turn on the test equipment and the oscilloscope. Let them warm up for 
30 minutes before starting the test. 
2 Set up the oscilloscope calibrator. 
a Set the oscilloscope calibrator to provide a DC offset voltage at the 
Channel 1 output. 
b Use the multimeter to monitor the oscilloscope calibrator DC output 
voltage. 
3
Use either method 1 or method 2, described in the following, to connect 
the digital channels for testing.
a Method 1 — Using the Test Connector
Use the 8-by-2 test connector and the BNC cable assembly to connect digital 
channels D0-D7 to one side of the BNC Tee. Then connect the D0-D7 ground 
lead to the ground side of the 8-by-2 connector. See figure 3-2.
Figure 3-2
Setting Up Equipment and Test Connector for the Threshold Test
42
t
hr
es
h.
cd
r
HP 34401A
!
Test 
Connector
Channels 8 - 15
Channels 0 - 7
BNC-Banana 
cable
Oscilloscope 
Calibrator
Digital 
Multimeter
service.book Page 7 Wednesday, August 28, 2002 3:25 PM










