Specifications

46 Hardware Installation
3 Checklists
Installation Checklist
Verifying that site preparation is complete
Adequate space is available for the MSD system.
Suitable supporting bench.
Adequate electrical power is available at the correct voltages and
frequencies.
Environmental control systems are adequate to maintain a correct, stable
operating environment.
Safe exhaust venting preparations are adequate.
Supplies necessary for instrument operation are available, including
solvents, carrier and reagent gasses, and printer paper.
Conveniently located telephone.
Unpacking and inspecting the shipped materials
Shipping containers must be opened only with an Agilent Technologies
representative present to verify the contents of each container.
Check each item off on the packing list and verify serial numbers.
Record the serial numbers in the installation documentation.
Retain shipping containers and material until contents are checked for
completeness and instrument performance is verified.
Notify the distribution center of any missing or damaged items.