Technical data

Installation 1
Agilent Multimode for 6210/6220 TOF Installation and Maintenance Guide 15
3 Connect the other M-F 10MΩ ballast MIDGI cable (p/n G1978-60806) in
series with the VChamber power supply cable and plug it back into to
VChamber power supply output.
4 Connect the M-F 10MΩ ballast SCID cable (p/n G1978-60805) in series with
the Vcap cable then plug it back into to VCap output of the power supply.
Figure 6 Cables tucked to the side of the power supplies
5 Install the analyzer board if it was not already installed.
6 Arrange the cables down to the side of the power supplies so the middle
foam will fit when replaced.
7 Replace all electronic tub components and reconnect all cables that were
disconnected.