User`s guide

Chapter 1 1-81
System Verification and Performance Tests
Performance Tests
Port 1 to Port 3 Full 2-Port Calibration
1. Connect the equipment as shown in Figure 1-38.
Figure 1-38 First Full 2-Port Calibration Test Setup (Port 1 and Port 3)
2. Press Preset, Start, 300, k/m.
3. Press Cal, CAL KIT, SELECT CAL KIT, CAL KIT:N 50, RETURN, RETURN,
CALIBRATE MENU, FULL 2-PORT.
4. Press ISOLATION, OMIT ISOLATION.
5. Connect the open (supplied in the calibration kit) to Port 1.
6. Press REFLECTION, FORWARD:OPEN, OPEN (F), DONE OPENS.
7. Connect the short to Port 1.
8. Press FORWARD: SHORT, SHORT (F) DONE SHORTS.
9. Replace the short with the 50 termination (supplied in the
calibration kit).
10.Press FORWARD:LOAD.
11.Connect the open to reference test port 3.
12.Press REVERSE:OPEN, OPEN (M), DONE OPENS.
13.Connect the short to reference test port 3.
14.Press REVERSE: SHORT, SHORT (M), DONE SHORTS.