User`s guide

Chapter 1 1-85
System Verification and Performance Tests
Performance Tests
7. Connect the short to reference test port 1.
8. Press FORWARD: SHORT, SHORT (M) DONE SHORTS.
9. Replace the short with the 50 termination (supplied in the
calibration kit).
10.Press FORWARD:LOAD.
11.Connect the open to Port 3.
12.Press REVERSE:OPEN, OPEN (F), DONE OPENS.
13.Connect the short to Port 3.
14.Press REVERSE: SHORT, SHORT (F), DONE SHORTS.
15.Connect the 50 termination to Port 3.
16. Press REVERSE: LOAD.
17.When the analyzer displays PRESS ‘DONE’ IF FINISHED WITH
STD(s), press STANDARDS DONE.
Wait for the message COMPUTING CAL COEFFICIENTS to disappear
from the analyzer display before proceeding to the next step.