User`s guide
Chapter 1 1-99
System Verification and Performance Tests
Performance Tests
Port 1 to Port 2 Second Full 2-Port Calibration
1. Connect the equipment as shown in Figure 1-48.
Figure 1-48 Second Full 2-Port Calibration Test Setup (Port 1 to Port 2)
2 Press Preset, Start, 300, k/m.
3. Press Meas, SELECT PORTS [1–2].
4. Press Cal, CAL KIT, SELECT CAL KIT, CAL KIT:N 50Ω, RETURN, RETURN,
CALIBRATE MENU, FULL 2-PORT
.
5. Press ISOLATION, OMIT ISOLATION.
6. Connect the open (supplied in the calibration kit) to reference test
port 1.
7. Press REFLECTION, FORWARD:OPEN, OPEN (M), DONE OPENS.
8. Connect the short to reference test port 1.
9. Press FORWARD: SHORT, SHORT (M) DONE SHORTS.
10.Replace the short with the 50Ω termination (supplied in the
calibration kit).
11.Press FORWARD:LOAD.
12.Connect the open to Port 2.
13.Press REVERSE:OPEN.










