Technical data
Chapter 4 4-7
Start Troubleshooting Here
Step 2. Operator's Check
4. Press to access the input R and B operator’s check. When the title appears,
press . Move the RF cable from input A to B. Press , as
prompted, until the analyzer displays “PASS” or “FAIL.”
If the Operator’s Check Failed
• Recheck the equipment configuration and connections; if necessary, retest.
• Confirm that the attenuator, splitter and cables meet their published specifications.
Visually inspect the connectors. Retest or refer to “Step 4. Faulty Group Isolation” on
page 4-10.
22 x1
EXECUTE TEST CONTINUE










