Troubleshooting guide
Lab Exercise: Acquisition Methods 
Priming the Agilent 1100/1200 Solvent Delivery System 
21 
Priming the Agilent 1100/1200 Solvent Delivery 
System 
You should prime the pump when you change mobile phases, when the 
instrument has been sitting without flow for long periods of time, when you have 
performed maintenance on the HPLC, or when you experience periodic 
perturbations in the baseline. 
1)  If you are equipped with a vacuum degasser, make certain the degasser is on. 
2)  Ensure that the outlet tube is connected from the purge valve to the waste 
container. Open the purge valve located on the pump module by turning the 
knob counter clockwise several turns. 
3)  To prime the solvent delivery system, you should pump 100% at 5 mL/min 
from each channel for several minutes. To accomplish this task, select the 
following menu items: Instrument, Set up Pump...; or click on the pump in 
the system diagram (shown below), then Set up Pump.... 
4)  Type in a Flow of 5.000 mL/min and %A of 100. OK the window. 
5)  To turn the solvent delivery system on, you may use the menu items: 
Instrument, More Pump, Control; or, access the tool shown in the diagram 
below. Do this now. 
Click here 










