Service manual
170 PRINT " 1.  Turn mainframe, power supply, and DMM power OFF" 
180 PRINT  " 2. Connect GPIB cable between mainframe and DMM" 
190 PRINT  " 3. Install component assembly into mainframe" 
200 PRINT  " 4.  Attach test fixture to component assembly" 
210 PRINT  " 5. Turn mainframe and DMM power ON" 
220 PRINT " 6.  Press Continue when ready to begin testing" 
230 PAUSE 
240 ! 
250 ! Start Test 
260 ! 
270 OUTPUT @Mux;"*RST" 
280 OUTPUT @Dmm;"PRESET NORM;FUNC DCV" 
290 FOR I=0 TO 5 
300  CLEAR SCREEN 
310  PRINT " 1. Connect 100 kOhm resistor from DMM Input HI to DMM
Input LO" 
320  PRINT " 2. Connect DMM Input HI lead to ";Path$(I,0) 
330  PRINT " 3. Connect DMM Input LO lead to ";Path$(I,1) 
340  PRINT " 4. Connect Power Supply ";Path$(I,2);" to ";Path$(I,3)
350  PRINT " 5. Turn ON power supply and set output for +10 Vdc"
360  DISP "Press Continue when connections are complete"
370  PAUSE
380  OUTPUT @Dmm;"TRIG SGL"
390  ENTER @Dmm;Result (I,0) 
400  IF Result (I,0) > .01 THEN 
410  PRINT "Direct path leakage out of tolerance";Result (I,0);" Volts" 
420  END IF 
430  ! Channel check 
440  OUTPUT @Mux;"CLOS (@"&Cc$&"00)" 
450  OUTPUT @Dmm;"TRIG SGL" 
460  ENTER @Dmm;Result (I,1) 
470  IF Result (I,1) > .01 THEN 
480  PRINT "Channel path leakage out of tolerance";Result (I,1);" Volts" 
490  END IF 
500  OUTPUT @Mux;"*RST"
510  ! Tree check 
520  OUTPUT @Mux;"SCAN:PORT ABUS" 
530  OUTPUT @Mux;"CLOS (@"&Cc$&"00)" 
540  OUTPUT @Dmm;"TRIG SGL" 
550  ENTER @Dmm;Result (I,2) 
560  IF Result(I,2) > .01 THEN 
570  PRINT "Tree A path leakage out of tolerance";Result (I,2);" Volts" 
2-20 Verification Tests










