User guide

24
Fragment Library Preparation Using the AB Library Builder
System: 5500 Series SOLiD
Systems User Guide
Chapter2 Prepare to Build the Library
Set up the AB Library Builder
System for size-selected or express fragment library preparation
Insert the loaded cartridge rack into the instrument:
WARNING! Do not touch the surface of the heat block. The temperature of the
heat block can reach 95°C. Touching the block can cause burns.