User`s guide

Setting Up the Agilent 5500 SPM 3
Agilent 5500 SPM User’s Guide 55
Facility Requirements
Following these guidelines for preparing the Agilent 5500 SPM facility
will ensure a smooth installation, will make using the system more
convenient and will improve system performance for the life of the
SPM:
Minimize the acoustic noise level from all possible sources, such as
paging speakers, telephone ringer, air conditioner, especially during
data acquisition.
Install the equipment as far away as possible from facility equipment
such as air handlers and pumps.
Reduce the exposure of the SPM to air flow or dramatic temperature
changes. Minimal temperature variation is desirable to minimize
thermal drift during measurements and to minimize settling time..
Use dedicated power outlets with surge protection (strongly
recommended).
Include a set of organized shelves and drawers for system
components.
If gold substrates are frequently used, a hydrogen flame-annealing
station is recommended.
Appropriate water sources should be available for temperature
control and biological experiments.