Technical data
Device Hi-Speed Tests 3
Notes on USB Electrical Compliance Testing 69
3 Place the test fixture Test Switch (S1) into the TEST position. This 
switches in the data generator in place of the host controller. The data 
generator emulates the "IN" packets from the host controller.
4 Click  OK to close the Test Instructions dialog.










