Installation Guide
www.airkinglimited.com
6728065 Rev. B 10-14 3 of 12
CAUTION: ALWAYS DUCT THE FAN TO THE OUTSIDE THROUGH A WALL OR
ROOF CAP.
SECTION 7
Setting the speed control
1. Your range hood is equipped with a speed control that allows
the hood to run continuously at the preset CFM level. To set
the CFM level, move the rotary dial located inside the wire
compartment to the desired CFM.
2. Locate the rocker switch labeled "ASHRAE 62.2" on the
speed control cover and make sure it is in the ON position. To
turn the continuous speed function off, set the switch to the
OFF position.
WARNING: SWITCHING THE CONTINUOUS SPEED
ROCKER SWITCH TO THE OFF POSITION DOES NOT TURN THE
MAIN POWER TO THE HOOD OFF.
SECTION 8
Finishing the Installation
1. Install the wire compartment cover and tighten screw. Make sure all wiring is securely
contained within the wire compartment.
2. Reinstall the bottom cover removed in Section 1 using the 4 screws to secure it in place.
3. Reinstall the filters by fitting them into the channel on either side of the hood and
pushing upwards on them until they are secured in place (Figure 9).
4. Install the included 18 watt fluorescent lamps into the lamp holder by lining up the pins
on the lamp base to the socket of the lamp holder and gently turning clockwise until the
lamp snaps into place and is firmly seated in the lamp holder.
5. Turn switches to the “OFF” position and restore power. Test that the light and the fan are
operating properly.
6. If there is any vibration noise, check for the source and try to tighten fasteners or adjust
the tape to make a tighter connection or seal.
SECTION 9
Controls
Your Range Hood is equipped with two rocker style switches with one controlling the lighting
and the other controlling the exhaust fan. The light switch has two positions, On (
• ) and OFF
(
°
). The fan switch has three positions, High ( • • ), Low ( • ), and OFF (
°
).
SECTION 4
Installing the Range Hood
CAUTION: MAKE SURE POWER IS SWITCHED OFF AT SERVICE PANEL BEFORE
STARTING INSTALLATION.
NOTE: If installing into existing construction and you will not have access to the ductwork
once the hood is in place, make ducting connections at this point. Refer to the Ducting
Section for instructions.
1. Install the 4 mounting screws at the previously marked locations. Leave approximately 1/8"
clearance. Slide the hood in place through the keyhole slots and align the front of the hood
so that it is flush with the front of the cabinets. Tighten all screws securely (Figure 6).
CAUTION: DO NOT INSTALL CLOSER THAN 20 INCHES ABOVE COOKING SURFACE.
SECTION 5
Wiring
CAUTION: ALL ELECTRICAL CONNECTIONS MUST BE MADE IN ACCORDANCE
WITH LOCAL CODES, ORDINANCES, OR NATIONAL ELECTRICAL CODE. IF YOU ARE
UNFAMILIAR WITH METHODS OF INSTALLING ELECTRICAL WIRING, SECURE THE
SERVICES OF A QUALIFIED ELECTRICIAN.
1. Connect the two loose White wires from the range hood to the White wire from the
supply, and the loose Black wire from the range hood to the Black wire of the supply.
Connect the ground wire (green or bare) from the supply to the green ground screw of
the hood. Use approved methods for all connections (Figure 7).
SECTION 6
Ducting
CAUTION: ALL DUCTING MUST COMPLY WITH LOCAL AND NATIONAL
BUILDING CODES.
WARNING: TO REDUCE THE RISK OF FIRE, USE ONLY METAL DUCTWORK.
1. Connect the ducting to the hood’s duct collar. Secure in place using tape to seal all joints
(Figure 8).
Keyhole
1/8"
Figure 6
Figure 8
Figure 7
Neutral
(White)
From Hood
Hot (Black)
Ground
(Green or Bare)
From Hood
ON
ASHRAE 62.2
OFF
Channel
Figure 9