Installation Manual

36. Position the Riser tube in the inner fender , behind
the panel. Slide the Hump Hose and Clamps onto the
Air Box inlet . Tighten both Hose Clamps.
37. Prepare the Snorkel Tube Gasket (#23) to be used
as a template.
A.) Lay two 8” strips of tape, adhesive side up, in a
“X” pattern on a bench.
B.) Place the Gasket in the center of the X taking care
not to block any bolt holes.
C.) Attach two 1” strips of tape, adhesive side down,
on the Gasket in the 12 and 3 O'clock position.
38. Carefully align the Gasket holes with the drilled
holes in the panel and attach it using the two small
strips of tape.
39. Determine the optimal position of the Snorkel Tube
(#30) for your particular cage configuration. Hold the
tube in place and fold the two 8” strips of tape over
onto the Snorkel flange.
40. Carefully remove the Snorkel Tube with Gasket
held in position by the tape.
41. Mark the hole to be drilled with a center punch.
42. Remove the Gasket and drill the bolt holes in the
Snorkel Flange. Start with 1/8” pilot holes and finish
with 5/16” holes.
43. Place the Gasket between the Riser Tube and the
Panel. Align the bolt holes.
Note: Tension between the Tube and panel should be
enough to hold Gasket in place. If not, reposition the
Riser Tube in Hump Hose.
44 Temporarily install two Threaded Studs (#11), fin-
ger tight, into the Riser Tube as shown.
Page 4
A
A
A
A
C
C
45. Slide the second Snorkel Tube Gasket on to the
Threaded Studs.
46. Mount the Snorkel tube on to the Threaded Studs
and secure using one 1/4-20 x 1” Button Head Bolt
(#31), 1/4” Lock Washer (#15), and 1/4” Flat Washer
(#14). Do not fully tighten at this time.
47. Replace the Threaded Studs, one at a time, with the
remaining 1/4-20 x 1” Button Head Bolts and 1/4”
Washers from the previous step. Make all three Bolts
final tight.