Installation Manual

PureFlow AirDog®
AirDog® FP-100 & FP-150 2005 and Up Cummins Diesel
Section 4 Fittings, Brackets, and Mounting
9
Installing the AirDog
®
Fittings & Mounting the Bracket on the
Truck’s Frame Rail
4-1. Dip the threaded end of the 1/2” male J2044 quick connect x 3/4” UNF fittings (08J2044-
3/4UNF) into clean motor oil and hand-thread into the “ENGINE” and “FUEL IN” ports in
the AirDog®. Using a 7/8" deep socket, torque these fittings to 180in-lb or 15ft-lb. DO
NOT overtighten the fittings or damage may occur!
INSTALL THE AirDog® ON THE BRACKETS AND THE TRUCK’S FRAME
4-2. Assemble the AirDog mounting bracket (001-3C-0004) to the frame bracket (010-3C-
0001) using the spacer (010-3C-0003-A-P) as shown in figure 3 using the four bolts, lock
washers, and nuts included in the mounting bracket hardware kit (figure 4). Properly
torque all fasteners! The bracket assembly should look like figure 5. You will need a
3/16” Allen and a 1/2" Wrench.
Figure 3
“Fuel In”
“Engine”
Figure 2
Figure 5
Figure 4