Assembly Instructions

OPT1-M-104 Rev.01 Optimus-1 EX - FTS Mast Assembly Procedure
Page 20 of 33
5. If the battery was connected correctly, then all the power LEDs (except D32 "POE" LED)
should be turned on (see Figure 14).
6. Close the FTS unit, make sure to have the cover 4 screw firmly tightened.