Installation Guide

AirSynergy Equipment Installation Guide
Page 26 Commercial in Confidence SYN-UG-007 Rev A0.41
4.3.3 Fit the GPS antenna assembly to the body of the AirSynergy using the single M6 screw and
lock washer provided in the kit. There is a threaded hole at the top corner of the AirSynergy unit for
this purpose. The TNC to TNC cable loop can be gently positioned behind the front mount antenna (or
sunshield) as shown in Figure 24. Weather-proofing tapes (self -amalgamating followed by a layer of
black PVC tape) should be applied to the TNC connections.
Figure 24 Assembling the GPS antenna and bracket assembly to AirSynergy
4.4 Secure AirSynergy and Antenna to pole mount plate
To mount AirSynergy to the universal mounting plate, perform the following steps:
NOTE: If the installation is for a back to back arrangement with 2 AirSynergy units sharing the
same mounting bracket refer to additional step in APPENDIX B.
4.4.1 Hook the studs into the top slots of the mounting plate. With the studs engaged in the top
slots raise the unit slightly until the bottom studs also drop into their respective slots. Secure
the flange nuts (4 positions) with the require degree of down-tilt.
4.4.2 Follow the Figure sequence from Figure 25 to Figure 28 for the positioning of the AirSynergy
into the mounting bracket slots.
Figure 25 Lift AirSynergy to top of pole-mount plate