Installation Guide

AirSynergy Equipment Installation Guide
Page 32 Commercial in Confidence SYN-UG-007 Rev A0.41
Figure 35 AirSynergy antenna connections applying PVC tape
Ensure the RF connector is completely sealed from the weather.
5.3 Connect PoE drop cable to the AirSynergy
5.3.1 Plan the position of the drop cable run from the AirSynergy unit to the PoE (Power over
Ethernet) injector. The recommended maximum run length is 20m. Uncoil the cable and secure with
the metal connector hood just below the AirSynergy unit. Pull back the hinged protective dust cover
and insert the PoE connector so that the RJ45 connector engages and the Amphenol hood locks into
place with the hinged dust cover. When securing the cable, make sure that there is no tension on the
connector so that it is easy to disconnect and re-connect for maintenance activities in the future. Take
care not to displace the square section sealing grommet from its channel at the end of the connector
since this is a vital to provide adequate water sealing.
Figure 36 Attach PoE drop cable to the AirSynergy