Installation Guide

AirSynergy Equipment Installation Guide
Page 41 Commercial in Confidence SYN-UG-007 Rev A0.41
6.3 Connecting the d.c. PSU
NOTE: For USA deployments and alternative PSU and enclosure arrangement
is required Refer to Appendix E
Figure 49 Pass the d.c. power cable end through the end cap of a PoE gland
Figure 50 Pass the d.c. power cable through the gland and tighten the end cap
6.3.1 The d.c. power cable (with red and black wire ends) must be passed through the correct cable
gland into the PoE until at least 5mm of black outer sheath protrudes into the box. Tighten the gland
end caps securely with pliers taking care not to over tighten or damage the plastic.