Installation Guide

AirSynergy Equipment Installation Guide
Page 57 Commercial in Confidence SYN-UG-007 Rev A0.41
11 Appendix D Checklist
The Checklist below gives the high-level steps in the Workflow for this procedure. Detach or print this
page to use as a job-aid for completing the actions this procedure requires.
Table 3 - Checklist for Procedure
Procedure
Actions
Outcome
1. Verify Prerequisites
Verify site requirements
Verify safety
requirements
Verify installation
requirements
All requirements are in
place for a successful
installation
2. Install AirSynergy
universal mounting plate
Install the universal
mounting plate
Verify connection torque
settings
3. Install AirSynergy on
the mounting plate
4. Connect and manage
cables
Connect AirSynergy PoE
cable
Connect GPS
5. Connect power system
Connect PSU to PoE
injector
Connect Power
Connect the protection
earth to the PoE injector
box
Connect Ethernet
backhaul