Installation Guide

AirSynergy Equipment Installation Guide
Page 59 Commercial in Confidence SYN-UG-007 Rev A0.41
Remove the top cover of the PSU enclosure. Choose suitable positions for the PSU enclosure within
1m of the PoE injector. The PSU enclosure should be screwed to a firm surface with screws in 4
positions which are only accessible with the top cover removed.
A 1metre length of 2 core connecting cable should come pre-attached to the 48V output terminals as
shown in Figure 68. This cable may be cut to shorter length, depending on the position of the PoE
injector. Terminated the DC cable in the PoE injector as described in section 6.3.1
Figure 71 Internal PSU and and cable terminations
Isolate the mains supply and pass the mains cable through the input gland and terminate on the
connection blocks provided. The termination blocks are clearly labelled as Live, Neutral and Earth.
Once the enclosure top cover has been re-fitted (4 screw positions) and the PoE wiring completed the
mains power can be applied.
Safety - Disconnection of AC supply
Where Airsynergy is connected directly to building wiring a suitably rated
and readily accessible disconnect device shall be incorporated external to the
equipment;
Where Airsynergy is connected to the ac mains supply using a plug and socket, the
socket-outlet shall be installed near the equipment and shall be easily accessible.