User Manual

AS4000 Central Terminal
Installation and Commissioning
DLP 006
605-0000-452
Issue 1.3dr Date 7/02/00
Page 2 of 4
Check alarm status
indications Pass/ Fail
(DLP-009)
Test 1a
Test 2
Test 3
Execute self test
function on each
card Pass/ Fail
(DLP-009)
Test 4
Set-up Sitespan
(DLP-008(1)
Check exchange
power supplies
(DLP-007)
-21.8 V to -60VDC
Test 1b
Switch on Rack
and re-check
exchange power
supplies (DLP-007)
-21.8 V to -60VDC
Connect Test Equipment and
Establish the RX Gain control
for maximum sensitivity
Using DACU: 2.0-2.3GHz DLP-010
Using test ST: All bands DLP-011
Record voltage setting from
Site Controller.
Test 5
Test 6
Yes
Are there
any more
shelves to
test ?
END
Start New
Initial Rack
Installation (6.3)
Start Existing
adding modem shelves
to existing rack
Test TX output power and
record RX control voltage
Using DACU: 2.0-2.3GHz DLP-010
Using test ST: All bands DLP-011)
Note: If adding a shelf and
rack is in service omit this test
Measure Combiner
PSU output voltages
(DLP-007)
13.5V 500mV
No
Turn off power
Remove test equipment
Connect antenna
Turn on power
(DLP-011)
Is rack in
service?
Yes
No
Remove test equipment
Preparation of CT
Measure Modem
PSU output voltages
(DLP-007(4))
Soak a minimum of 2
Hours from power on
(DLP-009)
Download SC Software
(DLP-009)
Set into Service
(DLP-012)
Chart 1 Configuration and Test Procedure