User Manual

AS4000 Central Terminal
Installation and Commissioning
DLP 010
605-0000-452
Issue 1.3dr Date 7/02/00
Page 1 of 6 © Copyright Airspan Communications Corporation 2000
SETTING THE RECEIVE SENSITIVITY USING DA
COMMISSIONING UNIT (DACU)
2.0-2.3MHZ BAND ONLY
1. Setting Up The DACU
1. Ensure that Sitespan has been set up as in DLP-009.
2. The DA Commissioning Unit (DACU) is used during system commissioning and
routine maintenance. The Commissioning Unit acquires a full low rate RF downlink /
uplink through RF cabling coupled into the CT transmit / receive antenna ports. The RF
receive level is adjusted as required using Sitespan. For details on the operation of the
unit see 605-0000-455 DA Central Terminal Commissioning Unit Operators Manual
3. The Commissioning Unit is set up as in Figure 32
CT Rack Expansion Rack
Modem
Shelf 1
RF
Combiner
Shelf
Modem
Shelf2
Modem
Shelf 3
Modem
Shelf 4
Commissioning
Unit
TX/RX Shelves 1&2 TX/RX Shelves 3&4
PC with Sitespan
and LAT terminal
software
Power Meter
DC
Supply
Figure 32 DACU Connections to AS4000 DA CT Rack