User Manual

AS4000 Access Concentrator
Installation and Commissioning
IXL 001
605-0000-453
Issue 1.2dr Date 7/02/00
Page 2 of 6
1.3. Securing the rack using overhead Ironwork.........................................................3
1.4. Securing a Rack to a Wall ...................................................................................4
Access Concentrator Rack Cabling. ...................................................................DLP-003
1. DC Power...............................................................................................................1
2. Rack Earthing .........................................................................................................3
3. Alarm Unit (Type 55B) External Connections.........................................................3
4. Access Concentrator Interface Panel .......................................................................4
5. 2Mbit/s Cabling (CT Link)......................................................................................6
6. 2Mbit/s Cabling (Switch Link)................................................................................7
Card Installation ................................................................................................DLP-004
1. Preliminary .............................................................................................................1
2. Card Insertion .........................................................................................................2
System Configuration for testing .......................................................................DLP-005
1. General ...................................................................................................................1
2. Card Provision for New Installation ........................................................................1
2.1. PSU Voltage AC Shelves: (Test 2a)....................................................................2
3. Commissioning rack ...............................................................................................2
Turn -Up and DC measurements ....................................................................... DLP-006
1. Rack Turn-Up and Measuring Input Voltage(Test 1a).............................................1
2. Switching on the rack. (Test 1b)..............................................................................1
3. PSU Voltage AC Shelves: (Test 2a)........................................................................2
Setting Up system Using Sitespan ...................................................................... DLP-007
1. Setting up Site Configuration on Sitespan ...............................................................1
2. Setting up CT Rack and Shelf configuration on Sitespan.........................................4
3. Assign Central terminal Card Slots .........................................................................6
3.1. DTU Card...........................................................................................................6
4. Setting up AC Rack and Shelf configuration on Sitespan ........................................8
5. Assign Access Concentrator Card Slots.................................................................11
6. Configure AC Cards .............................................................................................12
6.1. CTU..................................................................................................................12
6.2. CAS..................................................................................................................12
6.3. DATA...............................................................................................................13
6.4. V5.1..................................................................................................................14
Shelf Controller Software Downloads ...............................................................DLP-008
Configuring the Acces Concentrator ................................................................. DLP-009
1. Configure the Access Concentrator.........................................................................1
2. Alarm and Status Indications (Test 3) .....................................................................3
3. Self Test (Test 4) ....................................................................................................4
Commissioning Test Results ..............................................................................DLP-010
1. Commissioning Test Results...................................................................................1