AS4000 Access Concentrator
Installation and Commissioning
DLP 001
605-0000-453
Issue 1.2dr Date 7/02/00
Page 3 of 4
2.2. Site Earth
Confirm the position of the grounding point using the site survey.
2.3. Flooring
Ensure that flooring is substantial enough to support the rack and can provide a secure
fixing.
2.4. Cable Trays
Verify that cable trays are installed to provide routing to the proper destinations and
are of adequate strength
2.5. Delivery Inspection
Upon taking delivery of the equipment consignment, check that the consignment
agrees in all particulars with the consignment delivery documentation (number of
boxes, descriptions, and the contents of boxes, etc.). Any discrepancy or damage must
be reported immediately to ACC for further instructions. In case of severe damage, do
not accept the consignment from the carrier. See Material Return and Repair
document 605-0000-427 for further details. The equipment is normally shipped as
shown in. Figure 1.
Rack (wooden crate)
AC plug in cards
(each in their own
individual packaging
inside a cardboard
box on a pallet)
Figure 1. Packaging for AC Site
If subsequent to the initial shipment incremental upgrades are made to the system the
equipment will be delivered in packaging of size and type suitable for that shipment.