RACK INSTALLATION
1. Positioning and Securing Racks
1.1. Installing Rack in a Suite
From the site survey, confirm the position of the AC Racks. If the racks are to be
positioned in a suite, metalwork will be required to secure it to the overhead structure.
Either a proprietary system or fabricated steelwork will be required - see site survey.
Manoeuvre the racks into position.
Figure 2. Access Concentrator Rack.