User Manual

AS4000 Access Concentrator
Installation and Commissioning
DLP 009
605-0000-453
Issue 1.2dr Date 7/02/00
Page 5 of 6
17. Click Self Test button to reset. Check that each card passes
18. This concludes the setting up at the access concentrator. The CT site can now be
commissioned
STOP. THIS PROCEDURE HAS BEEN COMPLETED.