User Manual

AS4000 Access Concentrator
Installation and Commissioning
DLP 010
605-0000-453
Issue 1.2dr Date 7/02/00
Page 3 of 4
Rack ID.............................
PARA
.
TASK / TEST LIMIT RESULT
Site Inspection & Verification
2 Mbit/s AC Shelf 1
Cabling AC Shelf 2
System Commissioning Tests
Test 1a Exchange DC Voltage
Supply 1
-21.8 to -60.0V DC
Supply 2
Test 1b Exchange DC Voltage
Supply 1
-21.8 to -60.0V DC
Supply 2
Test 2
AC Shelf 1 PSU1
5V DC
±
250mV
3.3V DC +0mV-300mV
2.1V DC+0mV-100mV
Test 2
AC Shelf 1 PSU2
5V DC
±
250mV
3.3V DC +0mV-300mV
2.1V DC+0mV-100mV
Test 2
AC Shelf 2 PSU1
5V DC
±
250mV
3.3V DC +0mV-300mV
2.1V DC+0mV-100mV
Test 2
AC Shelf 2 PSU2
5V DC
±
250mV
3.3V DC +0mV-300mV
2.1V DC+0mV-100mV
PARA. TASK / TEST LIMIT RESULT
Power Up and Self Test
Test 3
AC Shelf 1
Alarms and
Indications
PSU 1
PSU 2
SC Card
Aux Cards (if fitted)
Pass /Fail
Test 3
AC Shelf 2
Alarms and
Indications
PSU 1
PSU 2
SC Card
Aux Cards (if fitted)