User Manual

AS4000 Access Concentrator
Installation and Commissioning
DLP 011
605-0000-453
Issue 1.2dr Date 7/02/00
Page 1 of 6 © Copyright Airspan Communications Corporation 2000
SITE ACCEPTANCE
1. Site Inspection
Check all work areas are free of debris i.e. cable off-cuts, braid, dust and packaging
and that the site is as found.
2. Site Acceptance Forms
ACC and customer copies of site acceptance forms are provided on the following
pages.