User Manual

AS4000 Central Terminal Installation and
Commissioning
IXL 001
605-0000-432
Issue 1.3a Date 18th October 1999
Page 7 of 10
List of Charts
Table Page
DLP010
Chart 1. Card Insertion 3
Chart 4. Commissioning ALL-Bands connecting to Sitespan using Level Control Unit. 2
Chart 5. Commissioning 2.0-2.3GHz Band connecting to Sitespan using Test CRU. 3
Chart 6. Commissioning 2.3-2.5GHz Band connecting to Sitespan using Test CRU. 4
Chart 7. Commissioning 3.4-3.6GHz Band connecting to Sitespan using Test CRU. 5
DLP 022
Chart 10. Commissioning ALL-Bands connecting to Sitespan using Level Control Unit. 2
Chart 11. Commissioning 2.0-2.3GHz Band connecting to Sitespan using Test CRU. 3
Chart 12. Commissioning 2.3-2.5GHz Band connecting to Sitespan using Test CRU. 4
Chart 13. Commissioning 3.4-3.6GHz Band connecting to Sitespan using Test CRU. 5