6.4mm
(1/4)
6. mm
(3/16)
7/16
HEX
Crimp pin here using 0.096Hex
crimp
Trim cable to these dimensions
CFS11U F-Type Connector
18.8mm
(11/16)
6.4mm
(1/4)
All Crimps made with Airspan 212-8000-058 Crimp Tool
Crimp body here using 0.475Hex
crimp
Note: the inner sleeve passes
between the screen braid and
core insulator
Figure 61. Terminating F-Type Connectors to T10 cable
c) Ribbon Connection to Modular Units
1. The ribbon cables pass down the side of the modular units and connect to the 15
way D-type socket on the front of the unit.
12. Power and Standby Tests
1. Connect the unit to the mains and check that the PSU led is illuminated. This is
only visible when the battery compartment cover is removed.
2. The battery should be fully charged (12hrs) before checking the standby facility.
It would be expedient to have a fully charged battery placed in the unit to avoid
the need to make a return visit to the site for testing.
3. If the battery is charged the Battery Low LED should be extinguished and the
On Battery LED should be extinguished when the unit is being powered by the
main supply.
4. Switch off the main supply or remove the external supply fuse.
5. Check that the On Battery LED is illuminated.