User Manual

AS4000 Subscriber Terminal
Installation and Commissioning
DLP 012
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 1 of 2
FUNCTIONAL TESTS R,S,N & M SERIES VOICE
INSTALLATIONS
Telephony tests can only be done after the CT has been connected to a network
switch.
STEP PROCEDURE
1. Using Sitespan set up subscribers at the CT as outlined in the Sitespan user
guide 605-0000-428
2. Connect the test telephone to the NTU.
3. Dial Tone Present. Lift the telephone handset of VF 1 Off-Hook, and confirm
that dial tone is heard in the handset receiver. If a comfort tone has been set
check for comfort tone prior to Dial Tone. Record on the Test Result Sheet.
4. Outgoing call. Initiate a call from the subscriberstelephone to a test number
provided by the CT Office. Ensure that the call can be successfully set up and
that line quality is good.
5. Incoming call. Initiate a return call from the CT Office to the subscribers
telephone. Ensure that the call can be successfully set up and that line quality is
good.
6. VF 2 Test Calls. Repeat steps 4 to 6 for VF line 2.
7. End of Subscriber Terminal Commissioning. Ensure all results are recorded in
the test form.
STOP. THIS PROCEDURE HAS BEEN COMPLETED.