User Manual

AS4000 Subscriber Terminal
Installation and Commissioning
DLP 015
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 1 of 6
TEST RESULTS
All results of testing must be entered on this Test Result Sheet. Please
photocopy one for each ST to be commissioned.