BER TESTING
During commissioning A BER test can be set-up on the DA system to measure the
performance of the RF link. This can be achieved with the following procedures
STEP PROCEDURE
1. Setting up the BER Tester
1. Remove the 2Mbit/s connection at the AC Port mapped to the link to be tested.
2. Connect the 2Mbit/s cable from the BER tester to the Access Concentrator
Port
3. Configure the BER tester as follows:
Interface: Ternary
Linecode: HDB3
Frame: CAS MFM
Through Mode: Off
Tx Clock Source: Internal
Pattern: 2^23-1
PRBS Polarity: Inv
Receive Timeslots: As per Tx
Tx: Timeslot set to timeslot allocated to link
1.1 Configuring the DTU card
1. Connect the LAT cable to the DTU card
2. Put DTU into test mode Type:TE 0
3. To Enable through-path through DTU Download the following text file:
RW7_160k.txt