User Manual

AS4000 Subscriber Terminal
Installation and Commissioning
GSI-005
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 9 of 14
6.1 L Series Installation Check List.
Check site meets site selection criteria q
Position and fix Antenna mounting bracket q
Install Antenna q
Fix Interface Unit to wall (unless free standing required) q
Install power unit Type 5/6 q
Run drop cable q
Plug connector into Antenna q
Terminate the F-type drop cable connector at interface unit q
Programme Interface Unit q
Pan Antenna q
Measure and record RSSI voltage on test form q
Functional tests record result on test form q
Clear and tidy site q