User Manual

AS4000 Subscriber Terminal
Installation and Commissioning
DLP 002
605-0000-454
Draft Issue 1.3 Date 8/02/00
Page 1 of 6
INSTALLING THE ANTENNA (WALL MOUNT).
Use this procedure to install the antenna. Before installing the Antenna check that
the proposed position meets the site selection guidelines. See DLP 001
The Wall Mounting Kit comprises:
Item Quantity Use
Wall mounting Bracket 1 Fixed to Building
Wall Mounting Arm 1 Fixed to Antenna
M8 x 20mm Bolts 2
M8 Coiled Washer 2
M8 Plain Washer 2
Pivot connecting Arm and Bracket
M8 x 50mm Coach Bolt 4
M8 Plain Washer 4
Fixing to wood
M6 Dyna Bolt 4 Fixing to brick/block
M6 x 16mm Bolts 4
M6 Coiled Washer 4
M6 Plain Washer 4
Mounting antenna to arm
Cable Tie 3 Securing IF Drop Cable
STEP PROCEDURE
1. Antenna Positioning and Securing.
1. Confirm the position of the Antenna ensuring that there is no obstruction in front and
to either side.
2. When multiple STs are deployed at the same site the recommended minimum
spacing between each Antenna is 1 metre.
3. The Antenna mounting bracket should be fixed so that panning can take place in the
horizontal plane (i.e. pivots top and bottom). Check that line of sight with CT
antenna does not breach the deployment rules. (See DLP 002).
4. Note: Leave adequate clearance around the Antenna wall mounting assembly to
allow for the full adjustment range when aligning the Antenna.
5. Locate the direction of the CT site using the survey information and decide if the
Antenna is to hinge from the left or right to allow panning in the directions of the
CT antenna. The same bracket is used for left or right hinge, Rotate the bracket to
give the required orientation.