Specifications

Alignment & Adjustments 48 17730-248
AIRTEK
®
•
SOFTEK
®
for Blue Bird Buses
SPRING EYE RE-TORQUE
This procedure to re-torque is necessary when replacing
■
Front Hanger
■
Shackle Assembly
■
Steel Leaf Spring Assembly
AIRTEK RE-TORQUE PROCEDURE
FIGURE 8-21
1. Chock the rear wheels of the vehicle to prevent movement.
2. Verify ride height. Adjust if necessary, see AIRTEK Ride Height adjustment procedure in
this section.
3. Loosen all six (6) front and rear spring eye bolts, see Figure 8-21.
FIGURE 8-22
NOTE DO NOT remove the spring eye bolts.
4. Let the suspension settle.
5. Tighten the front M20 spring eye bolt locknuts to
vehicle manufacturer's specifications.
6. Tighten the rear M20 spring eye bolt and shack-
le bolt locknuts to vehicle manufacturer's
specifications.
7. Affix a straight edge to the bottom of the frame
rail in front of the air spring, see Figure 8-22.
8. With the vehicle on a level surface measure the
distance from the top of the straight edge to the
ground on both sides of the vehicle and record
the measurements.
9. Measure the difference from one side to the other.
10. Do a road test and repeat measurement steps
7 to 9.
11. If the measurement is less than
3
⁄8" the vehicle is
level. If measurement is more than
3
⁄8" contact
Hendrickson Tech Services.
L
90
1
APPENDIX
SERVICE MANUAL










