User's Manual

AW 96 Series System Installation Manual
___________________________________________________________________________
AirWalk Proprietary and Confidential Page 51 of 72 6/14/2006
Figure 7-2 - PC to AW 96 Cable Connection Diagram
10.3.2 System Certification Tests
Start The AW-SERIES IP-RAN tests.
This sequence of test cases is designed to certify the AW 96 IP-RAN installation.
It is assumed the person running this checklist is familiar with the basics of configuring,
running, stopping, and starting the AW 96 IP-RAN.
10.3.2.1 Test Case #1 - Image/PLD loading
10.3.2.1.1 Test Procedure #1
Command: user: ipbs001
FTP password: ipbs001
Command: Edit:
- P: display
- C: edit
10.3.2.1.2 Expected Result of Case #1
Screen from PC using ftp Server is shown in Figure 7-3.