5) Verify the Ethernet backhaul links are communicating by observing the activity
indicators on the external Ethernet switch. The activity indicators are typically found
on the front panel or adjacent to the connection point on Ethernet switches. The
indicators should be flashing intermittently to indicate the presence of IP packet
activity.
7.2.5 Installation Completion
Completion of the installation requires that all cables be suitably routed and bundled for a
neat appearance. All cables should be tie wrapped as needed to ensure cables will not
move or be stressed in normal system operation. External cables should be labeled in
accordance with the site specific installation drawings prepared by the site planning
engineer.
All garbage and installation materials, including wire clippings and tie wrap ends, must be
removed from the site prior to completing the installation.
7.3 Initial System Configuration
Each IP-RAN system requires configuration of key site specific information prior to
operation to allow the system to communicate and contact the controlling iBSM system.
One this initial information is configured the system will automatically download software
and configuration information from the iBSM. No additional on-site configuration is
required after this initial configuration is completed.
The following items must be configured in the base station after installation using the
Web Server installation support tool:
- IP-RAN IP Address: Locally valid static IP address (allows IP communications)
- IP-RAN Identity: Unique identifier associated with a iBSM site configuration
- Host iBSM IP Address of RNC: IP address of the controlling iBSM (allows initial
contact)
Additional capabilities are provided in the Web Server Installation Tool to identify sub-net
masks and net gateways, and the ability to select optional boot modes.
The required IP addresses and base station identity for a particular site are normally set
up in advance by the network control center engineers prior to site deployment. Ensure
this information has been provided prior to installation configuration.