7.3 System Test
This section contains the system tests that should be completed to determine if the
OneRAN Pilot Station is operational.
7.3.1 PC to OneRAN Pilot Station cable
A special cable is required to run the required certification tests.
Connect a PC with the subject cable to run tests
BTS
P1
CONNECTOR DB9
5
9
4
8
3
7
2
6
1
RJ1
RJ-45
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
BTS
P1
CONNECTOR DB9
5
9
4
8
3
7
2
6
1
RJ1
RJ-45
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
Pin Configuration
DB9 RJ-45
(Computer) (BTS)
5 3
3 5
2 7
Figure 7-1 - PC to OneRAN Pilot Station Cable Specifiaction
Figure 7-2 - PC to OneRAN Pilot Station Cable Connection Diagram
7.3.2 System Certification Tests
Start The OneRAN Pilot Station tests.
This sequence of test cases is designed to certify the OneRAN Pilot Station installation.
It is assumed the person running this checklist is familiar with the basics of configuring,
running, stopping, and starting the OneRAN Pilot Station.