User's Manual
Table Of Contents
- 1 INTRODUCTION
- 2 OneRAN Pilot Station Safety and Compliance Information
- 3 OneRAN Pilot Station System Introduction
- 4 OneRAN Pilot Station Components
- 5 OneRAN Pilot Station Interface Cabling
- 6 OneRAN Pilot Station Frequency Setting Procedures
- 7 OneRAN Pilot Station Installation Procedures
- 7.1 Installation Verification
- 7.2 OneRAN Pilot Station Install Procedures
- 7.3 System Test
- 7.3.1 PC to OneRAN Pilot Station cable
- 7.3.2 System Certification Tests
- 7.3.2.1 Test Case #1 - Image/PLD loading
- 7.3.2.2 Test Case #2 – System Check
- 7.3.2.3 Test Case #3 – Tx check
- 7.3.2.4 Test Case #4 – Output power
- 7.3.2.5 Test Case #5 – GPS Check
- 7.3.2.6 Test Case #6 – BTS Alarm Check
- 7.3.2.7 Test Case #7 – System Reset
- 7.3.2.8 Test Case #8 – PN Check
- 7.3.2.9 Test Case #9 – System Interface Check
- 7.3.3 Operation Tests
- 7.3.4 Operator Specific Tests
- 7.4 Site Clean up and Customer Signoff
- 7.5 Required Tools and Supplies
- 7.6 Troubleshooting Procedures
- 8 Appendix A - Acronyms
- 9 Appendix B - Site preparation checklist
- 10 Appendix C - Installation Checklist
- 11 Appendix D - Customer Certification Document
OneRAN Pilot Station System Installation Manual
____________________________________________________________________________
_____________________________________________________________________________
AirWalk Proprietary and Confidential Page 29 of 49
7.3 System Test
This section contains the system tests that should be completed to determine if the
OneRAN Pilot Station is operational.
7.3.1 PC to OneRAN Pilot Station cable
A special cable is required to run the required certification tests.
Connect a PC with the subject cable to run tests
BTS
P1
CONNECTOR DB9
5
9
4
8
3
7
2
6
1
RJ1
RJ-45
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
BTS
P1
CONNECTOR DB9
5
9
4
8
3
7
2
6
1
RJ1
RJ-45
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
Pin Configuration
DB9 RJ-45
(Computer) (BTS)
5 3
3 5
2 7
Figure 7-1 - PC to OneRAN Pilot Station Cable Specifiaction
Figure 7-2 - PC to OneRAN Pilot Station Cable Connection Diagram
7.3.2 System Certification Tests
Start The OneRAN Pilot Station tests.
This sequence of test cases is designed to certify the OneRAN Pilot Station installation.
It is assumed the person running this checklist is familiar with the basics of configuring,
running, stopping, and starting the OneRAN Pilot Station.