User's Manual
Table Of Contents
- 1 INTRODUCTION
- 2 OneRAN Pilot Station Safety and Compliance Information
- 3 OneRAN Pilot Station System Introduction
- 4 OneRAN Pilot Station Components
- 5 OneRAN Pilot Station Interface Cabling
- 6 OneRAN Pilot Station Frequency Setting Procedures
- 7 OneRAN Pilot Station Installation Procedures
- 7.1 Installation Verification
- 7.2 OneRAN Pilot Station Install Procedures
- 7.3 System Test
- 7.3.1 PC to OneRAN Pilot Station cable
- 7.3.2 System Certification Tests
- 7.3.2.1 Test Case #1 - Image/PLD loading
- 7.3.2.2 Test Case #2 – System Check
- 7.3.2.3 Test Case #3 – Tx check
- 7.3.2.4 Test Case #4 – Output power
- 7.3.2.5 Test Case #5 – GPS Check
- 7.3.2.6 Test Case #6 – BTS Alarm Check
- 7.3.2.7 Test Case #7 – System Reset
- 7.3.2.8 Test Case #8 – PN Check
- 7.3.2.9 Test Case #9 – System Interface Check
- 7.3.3 Operation Tests
- 7.3.4 Operator Specific Tests
- 7.4 Site Clean up and Customer Signoff
- 7.5 Required Tools and Supplies
- 7.6 Troubleshooting Procedures
- 8 Appendix A - Acronyms
- 9 Appendix B - Site preparation checklist
- 10 Appendix C - Installation Checklist
- 11 Appendix D - Customer Certification Document
OneRAN Pilot Station System Installation Manual
____________________________________________________________________________
_____________________________________________________________________________
AirWalk Proprietary and Confidential Page 34 of 49
7.3.2.7 Test Case #7 – System Reset
7.3.2.7.1 Test Procedure #7
• Command: btsReset/bscReset/allReset
7.3.2.7.2 Expected Result of Case #7
The system is RESET
7.3.2.8 Test Case #8 – PN Check
7.3.2.8.1 Test Procedure #8
• Command: RcmCmd 1,1
7.3.2.8.2 Expected Result of Case #8
Figure 7-11 - PN Check Screen
7.3.2.9 Test Case #9 – System Interface Check
7.3.2.9.1 Test Procedure
• Command: Ping
Send Ping Command to the Following system IP Addresses
1. WPM (Wireless PBX Manager)
2. PDSN (Packet Data Serving Node)
3. CA (Call Agent)
4. MG (Media Gateway)
5. SG (Signal Gateway)