User's Manual
Table Of Contents
- 1 INTRODUCTION
- 2 OneRAN Pilot Station Safety and Compliance Information
- 3 OneRAN Pilot Station System Introduction
- 4 OneRAN Pilot Station Components
- 5 OneRAN Pilot Station Interface Cabling
- 6 OneRAN Pilot Station Frequency Setting Procedures
- 7 OneRAN Pilot Station Installation Procedures
- 7.1 Installation Verification
- 7.2 OneRAN Pilot Station Install Procedures
- 7.3 System Test
- 7.3.1 PC to OneRAN Pilot Station cable
- 7.3.2 System Certification Tests
- 7.3.2.1 Test Case #1 - Image/PLD loading
- 7.3.2.2 Test Case #2 – System Check
- 7.3.2.3 Test Case #3 – Tx check
- 7.3.2.4 Test Case #4 – Output power
- 7.3.2.5 Test Case #5 – GPS Check
- 7.3.2.6 Test Case #6 – BTS Alarm Check
- 7.3.2.7 Test Case #7 – System Reset
- 7.3.2.8 Test Case #8 – PN Check
- 7.3.2.9 Test Case #9 – System Interface Check
- 7.3.3 Operation Tests
- 7.3.4 Operator Specific Tests
- 7.4 Site Clean up and Customer Signoff
- 7.5 Required Tools and Supplies
- 7.6 Troubleshooting Procedures
- 8 Appendix A - Acronyms
- 9 Appendix B - Site preparation checklist
- 10 Appendix C - Installation Checklist
- 11 Appendix D - Customer Certification Document
OneRAN Pilot Station System Installation Manual
__________________________________________________________________________________________________________________
___________________________________________________________________________________________________________________
AirWalk Proprietary and Confidential Page 46 of 49 5/6/2008
ITEM
#
Description
Install
Manual
Section
Date
Complete
Time
Customer
Contact
Initials
Installer
Initials
17 Prepare IP addressable device diagram 9.1.3.1.5
18 Post IP diagram at: i) site; ii) customer; iii) Airwalk Customer Service 9.1.3.1.5
19 Install OneRAN Pilot Station Cabinet 9.2.1
20 Move OneRAN Pilot Station to location 9.2.1
21 Secure OneRAN Pilot Station in designated location 9.2.1
22 Verify all internal System connections 9.2.2
23 External System Connections 9.2.3
MAKE SURE ALL SYSTEM POWER SUPPLIES ARE TURNED OFF BEFORE PROCEEDING! ! !
24 Connect Power to Cabinet 9.2.4
25 Connect -48VDC to DC distribution panel (If applicable) 9.2.4
26 Connect 120-240 VAC to AC distribution panel (If applicable) 9.2.4
27 Connect Communications Facilities 9.2.5
28 Connect LAN Facilities to BSC 9.2.5
29 Connect LAN Facilities to BTS 9.2.5
30 Power-up procedure 9.2.6
31 Power-up Main cabinet/rack power, check LEDs 9.2.6.1
32 Complete any configuration options 9.2.6.2
System Certification Tests 9.3.2
33 Test Case #1 - Image/PLD loading 9.3.2.1
34 Test Case #2 – System Check 9.3.2.2
35 Test Case #3 – Tx check 9.3.2.3
36 Test Case #4 – Output power 9.3.2.4
37 Test Case #5 – GPS Check 9.3.2.5
38 Test Case #6 – BTS Alarm Check 9.3.2.6
39 Test Case #7 – System Reset 9.3.2.7
40 Test Case #8 – PN Check 9.3.2.8