User's Manual
Table Of Contents
- 1 INTRODUCTION
- 2 OneRAN Pilot Station Safety and Compliance Information
- 3 OneRAN Pilot Station System Introduction
- 4 OneRAN Pilot Station Components
- 5 OneRAN Pilot Station Interface Cabling
- 6 OneRAN Pilot Station Frequency Setting Procedures
- 7 OneRAN Pilot Station Installation Procedures
- 7.1 Installation Verification
- 7.2 OneRAN Pilot Station Install Procedures
- 7.3 System Test
- 7.3.1 PC to OneRAN Pilot Station cable
- 7.3.2 System Certification Tests
- 7.3.2.1 Test Case #1 - Image/PLD loading
- 7.3.2.2 Test Case #2 – System Check
- 7.3.2.3 Test Case #3 – Tx check
- 7.3.2.4 Test Case #4 – Output power
- 7.3.2.5 Test Case #5 – GPS Check
- 7.3.2.6 Test Case #6 – BTS Alarm Check
- 7.3.2.7 Test Case #7 – System Reset
- 7.3.2.8 Test Case #8 – PN Check
- 7.3.2.9 Test Case #9 – System Interface Check
- 7.3.3 Operation Tests
- 7.3.4 Operator Specific Tests
- 7.4 Site Clean up and Customer Signoff
- 7.5 Required Tools and Supplies
- 7.6 Troubleshooting Procedures
- 8 Appendix A - Acronyms
- 9 Appendix B - Site preparation checklist
- 10 Appendix C - Installation Checklist
- 11 Appendix D - Customer Certification Document
OneRAN Pilot Station System Installation Manual
__________________________________________________________________________________________________________________
___________________________________________________________________________________________________________________
AirWalk Proprietary and Confidential Page 47 of 49 5/6/2008
ITEM
#
Description
Install
Manual
Section
Date
Complete
Time
Customer
Contact
Initials
Installer
Initials
41 Test Case #9 – System Interface Check 9.3.2.9
Operation Tests 9.3.3
42 Test Case #1 – Voice Calls 9.3.3.1
43 Test Case #2 – Data Calls 9.3.3.2
44 Operator Specific Tests (If Required) 7.3.4
Site Clean Up & Documentation
45 Dispose of all packing material 7.4.1
46 Clean-up site 7.4.2
47 Update Installation Checklist 7.4.3
48 Get Customer Signature on Certification Document 7.4.4