Installation Instructions

Installation Time: Approximately 15 Minutes
Tools Required: None
1. Choose the correct size and strength Mono-Post for the project based on
construction document.
2. Adjust screw to slightly short of the length needed between footer and
load carrying beam at installation location (
Figure
).
3. Place Mono-Post vertically between footer and beam with the adjustment
nut and screw on the footer (adjustable end down)
(Figure
).
4. Adjust screw to wedge the Mono-Post between footer and beam, tighten
until Mono-Post is firmly centered directly under the load carrying beam
and the footer below
(Figure
).
5. Additional screw adjustments may be made during construction to keep
floor level
6. Poured concrete basement floor permanently locks Mono-Post
adjustment
(Figure
).
TAMPER PROOF ADJUSTMENT: MONO-POST SHOULD BE POSITIONED WITH
ADJUSTMENT NUT AND SCREW AT THE FOOTER.
LOAD
CARRYING
BEAM
FOOTER
Note: Always consult Local Building Codes for
specific installation requirements in your area.