Specifications
© 2002 Alamo Group Inc.
Parts Section -137
Triumph Sickle Bar (Archive Book) 10/02
MODEL PARTS INFORMATION
Continued From Previous Page
Hydraulics Improvements
(Aux. Front Mounted Pump Only)
1. Hoses Routing (See Figure 2 & 3)
A. When the Pumps were changed in May 1998 the Governor was dis-continued
in system, This changed the Hose routing that was used previously.
B. System is required to hold 8 to 9 GPM to Operate Correctly, Routing & Type
Pump is Crittical to operation. Hose Routin & use of Governor MUST be to Match
whitch Pump is used, If converting to new style Pump it will be regired to change
Hose rRouting. See Diagrams below.
OLD HOSE ROUTING w/ Governor Apr. 1998 & Down (Figure 2)
Control
Valve
Flow
Governor
Pump
Reservoir
Suction Line
Pump Pressure Line
Flow 11 to 16 GPM
Excess Flow Return
Valve Return Line
Governed Flow
8 GPM
NEW HOSE ROUTING w/o Governor May 1998 & Up (Figure 3)
Control
Valve
Pump
Reservoir
Suction Line
Pump Pressure Line
Flow 8 to 9 GPM
Valve Return Line
Pump Flow,
8 to 9 GPM